![]() ![]() ![]() The completed aircraft is scheduled to take its first test flight by 2025, and could enter service by 2040. The model was of a delta wing-style aircraft with no vertical surfaces, which does not reflect radar laterally and significantly reduces its side aspect radar cross section. Data, insights and analysis delivered to you View all newsletters By the Airforce Technology team Sign up to our newsletters Sign up hereĪn NGF model was showcased in Paris at Euronaval 2018 last October. ![]() It will also be part of the Next-Generation Weapon System, working with unmanned ‘wingmen’ in the form of autonomous drones. The new aircraft will comprise brand new technology including a new Next European Fighter Engine, which is currently being developed by MTU Aero Engines and Safran.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |